SCG Site#3 ROC Metering skid

-Install instrumentation in metering skid
-Install conduit / cable tray in metering skid
-Power / signal cable laying and termination work
-Install air instrument tubing work
-Instrument loop test


Flowlab and Service New Laboratory

-Install instrumentation in laboratory
-Install conduit / cable tray in laboratory
-Power / signal cable laying and termination work
-Install air instrument tubing work
-Instrument loop test


SCG Site#1 TPE Metering skid

-Install instrumentation in metering skid
-Install conduit / cable tray in metering skid
-Power / signal cable laying and termination work
-Install air instrument tubing work
-Instrument loop test


BST Site#1 Butane-1 Metering skid

-Install instrumentation in metering skid
-Install conduit / cable tray in metering skid
-Power / signal cable laying and termination work
-Install air instrument tubing work
-Instrument loop test


PTT GSP Metering skid

-Install instrumentation in metering skid
-Install conduit / cable tray in metering skid
-Power / signal cable laying and termination work
-Install air instrument tubing work
-Instrument loop test


PTT GC2 Metering skid

-Install instrumentation in metering skid
-Install conduit / cable tray in metering skid
-Power / signal cable laying and termination work
-Install air instrument tubing work
-Instrument loop test


SCG Site#7 MOC Metering skid

-Install instrumentation in metering skid
-Install conduit / cable tray in metering skid
-Power / signal cable laying and termination work
-Install air instrument tubing work
-Instrument loop test


Thappline(TPN)Block valve stations

-Underground Cable work
-Installation instrumentation
-Installation conduit/tray/cable gland/JB
-Power/signal cable laying and termination work
-Install air instrument tubing work
-Welding ground loop and resistance test


C7729- Jord International E/I installation

-Install instrumentation
-Install conduit / cable tray /Gland / JB
-Power / signal cable laying and termination work
-Install air instrument tubing work
-Instrument loop test


The National Science and Technology Development Agency

-Install MDB / MCC /LCP
-Install conduit / cable tray /Gland / JB
-Power / signal cable laying and termination work
-Continuity and Insulation test with report



IRPC E/I Installation treatment skid Ultra clean fuel(UCF)

-Install instrumentation
-Install conduit / cable tray /Gland / JB
-Power / signal cable laying and termination work
-Install air instrument tubing work
-Instrument loop test


Toyota Motor Thailand(Gateway Plant)E/I Installation RO system

-Fabricate and install MCC / MDB
-Install instrumentation
-Install conduit / cable tray /Gland / JB
-Power/signal cable laying(underground) and termination work
-SCADA/PLC Programming
-Instrument loop test


GUSCO E/I Installation RO system

-Fabricate and install MCC / MDB
-Install instrumentation
-Install conduit / cable tray /Gland / JB
-Power/signal cable laying(underground) and termination work
-SCADA/PLC Programming
-Instrument loop test


Ecoblue Structure and assembly machines

-Fabricate structure
-Assembly machines (Boiler)





Mitr phol group Structure and assembly machines

-Fabricate structure
-Assembly machines (Filter press)





SCG Grid balance project

-DCS / PLC Programming
-PLC modification





Mitr phol biofuel Ethanol storage monitor and report

-DCS / PLC Programming
-PLC system installation





Mitr phol biofuel Ethanol storage monitor and report

-DCS software modification
-System stabilizer test





Mitr phol biofuel Ethanol storage monitor and report

-DCS / PLC software modification
-DCS / PLC system stabilizer test